The question is attached Consider the EOQ model with planned shortages, as pres

The question is attached
Consider the EOQ model with planned shortages, as presented in Sec. 18.3 of the textbook. Suppose, however, that the constraint S/Q = 0.8 is added to the model, where Q is the order quantity and S is the inventory level just after a batch of Q units is added to inventory.
2. Consider the EDQ model with plarmed shortages. as presented in See. 13.3 ofthe textbook.Suppose, however, that the constraint SEQ = {1.3 is aided to the model, where Q is the ordu qwmtit},r and S is the inventory level just after a batch of Q units is added to traitor-y. Required:Derive the expressions. for the optimal value of Q using the result for this model that the total cost per unit time is fineredisthedermdratexisthesotupoorhsistheuniteostofordering,histheuuitholding cost, andp is theunit shortage cost.

"Get 15% discount on your first 3 orders with us"
Use the following coupon
"FIRST15"

Order Now